Tuesday, March 31, 2009

TWSC Install

So last week we Installed a NanoStation 2 set up as a mesh node. This week we pulled it down and put a Metrix Mark I in its place. We needed a dual radio configuration due to the fact part of the backhaul is ran on 802.11a. After we swapped out equipment we headed down the street to * Art Gallery to install a NanoStation 2.





This is inside the room where the poe adapter and power supply is.



We still have several more NS2's to set up on this block but, for today I am done.

No comments:

Post a Comment